GRP is glass fibre set in resin. We mould it into dormers, chimneys, canopies, bay window roofs and other building components that arrive on site factory-finished and ready to install. All products are designed and manufactured in the UK – since 1985.
GRP stands for Glass Reinforced Plastic. It is a strong, lightweight composite material made by combining fine glass fibres with a resin, which cures to form a hard and durable material.
GRP is also commonly known as fibreglass, and the two terms are often used interchangeably in the construction and manufacturing industries.
Technically, fibreglass refers to the glass fibres themselves, while GRP refers to the finished composite material, where those fibres are embedded within the resin.
The GRP in every component we make is built from three materials:
● Gel coat – The outer surface, which carries the colour and finish.
● Glass fibre – The reinforcement that gives it strength.
● Resin – The binder that holds the fibres in shape once cured.
The gel coat is applied to the mould first, creating the visible surface of the finished product. Because the colour is incorporated into the gel coat rather than applied afterwards as paint, the finished surface does not normally require painting or decorating once installed.
Layers of glass fibre and resin are then built up behind the gel coat to achieve the required thickness and strength. As the resin cures, the GRP takes on the precise shape and detail of the mould.
This allows us to accurately reproduce the appearance and texture of traditional materials such as lead, stone, brick, tile and render, while producing a finished component that is lightweight, durable and often easy to install in a single piece.
We have been manufacturing GRP in the UK since 1985, with components produced across six manufacturing sites around Tamworth and Scunthorpe. This gives us the flexibility to manufacture anything from a single bespoke component to high-volume repeat products for every plot on a large housing development.
Every project begins with our in-house estimating and technical teams. Working from your drawings, they use Building Information Modelling (BIM) to identify a suitable standard product or develop a bespoke solution. A component can be modelled and reviewed against your working house designs before manufacture begins, allowing us to assess its suitability and make any necessary design alterations early in the process.
For bespoke designs, we first create a pattern from which the GRP mould is produced. The component is then manufactured within the mould using gel coat, glass fibre and resin. The gel coat forms the visible surface and determines the colour, texture and finish, allowing us to reproduce effects such as lead, tile, brick and render, in colours selected from RAL or BS colour charts.


For many of our entrance door canopies, we use Resin Transfer Moulding (RTM). This process delivers a high-quality, consistent and repeatable finish whilst significantly reducing material waste compared with traditional spray-up moulding methods.
Once cured, each component is trimmed and assembled to the agreed design and specification. Our GRP bays and dormers are supplied with factory-applied insulation and products arrive on site complete with the relevant fixings required for installation, helping to reduce the amount of work required on site.
Quality and consistency are controlled throughout the manufacturing process. Our management systems are certified to ISO 9001:2015 for quality, ISO 14001:2015 for environmental management and ISO 50001:2018 for energy management. Production of our certified products is also regularly audited by the British Board of Agrément (BBA).
Once complete, finished components are carefully shrink-wrapped and delivered to site, ready for installation.
GRP from Stormking | Brick, stone, lead, timber and concrete | |
Weight | All products are light weight when compared to their traditional counter parts. Products like chimneys and dormers have significantly less load applied to roofs. | At the Grand Hotel in Birmingham, like-for-like traditional dormers were too heavy and time consuming when compared to the modern building methods used in the restoration. |
Installation | Arrives factory finished. Canopies and bays are easily installed, Dormers have sacrificial lifting beams for a telly hoist or forklift, and SmartStack chimneys have a single lifting point, so each goes up in one lift. | Built on site by specialist trades such as bricklayers, stonemasons or leadworkers, and exposed to weather delays while they work. |
Maintenance | No painting or decorating, because the colour is in the gel coat. Clean periodically with an ammonia-free detergent. | Timber needs repainting, and brickwork and stone need repointing over the life of the building. |
Weathering | Building Research Establishment (BRE) research found service lives of 60 to 100 years. | Timber rots once its paint fails. All traditional methods of construction require more regular maintenance. |
Design freedom | Any shape a mould can take, in lead, stone, brick, tile or render effects, and repeatable in volume. | Complex shapes such as curved or pitched roofs take skilled labour and time on every plot. |
Sustainability | Impacts are published in BRE-verified Environmental Product Declarations (EPDs 000650 and 000651). | Varies by material and supplier. |
With timber, brick, stone or lead, the real cost of the job includes the scaffolding, the specialist trades and the extra days on site. GRP cuts most of that out, so the roof is finished sooner.
Our COPEKING® coping installs 75% faster than traditional coping, and our dormers and SmartStack chimneys each go up in a single lift.
A common worry is that GRP will look cheap next to the real thing. Our finishes reproduce lead, stone, brick, tile and render, with no compromise to aesthetics.
If you’re asked whether a plastic can be a responsible choice, our Environmental Product Declarations give you published, BRE-verified figures to compare against other materials on your project.
Stormking pride itself on providing our customers with design and technical support for the products we manufacture.
We appreciate that it can be easier to discuss designing your products directly with the team to see how we can best help your next project. Email your enquiry directly to the design team, via the button below.
We keep a stocked range of standard housebuilding components, and we design and make custom pieces alongside them.
Here’s what we make:
● Dormers, with apex, catslide, flat and hipped roofs
● Bay window roofs, curved, flat, lean-to, oriel and pitched
● SmartStack chimneys in brick effect and render effect finishes
● Entrance door canopies, including Polycarbonate ‘Clearlight’ designs
● COPEKING® coping, single and double weathered
● Columns, posts and porticos
● Window surrounds
● Roof towers and finials
Outside housebuilding, we make GRP substation roofs and doors. For anything not on this list, our custom GRP fabrication service takes your drawing to a finished component made to order.
When you specify a GRP component, you need confidence that it will perform as intended, be manufactured consistently and arrive on site ready to install. That’s exactly what Stormking delivers.
Our GRP dormers and bay window roofs are covered by BBA Certificate 17/5434, while our SmartStack chimney systems are covered by BBA Certificate 18/5539. The certificates set out exactly what has been independently assessed, including wind loading, behaviour in fire and weathertightness for SmartStack.
The BBA also regularly audits our manufacturing processes, helping ensure the component delivered to site is manufactured to the same specification as the product that was tested.
Independently verified environmental data
We also publish BRE-verified Environmental Product Declarations (EPDs) for our GRP products:
• EPD 000650 – insulated GRP products
• EPD 000651 – uninsulated GRP products
These EPDs, together with our wider certifications and accreditations, are available to review before you specify our products, giving your technical and sustainability teams the information they need from the outset.
Trusted by leading UK housebuilders, Stormking GRP components are used by major housebuilders including Barratt Redrow, Taylor Wimpey, Vistry, Persimmon, Bellway, as well as well as specialist roofing contractors such as Smart Roof and Roofspace Solution.










If you’re considering moving from another UK fibreglass or GRP manufacturer, we’ve made the process as simple as possible.
Our technical drawings and BIM files are available through the Tech Hub, delivery to site is free*, and our experienced on-site support team is available to help from specification through to installation.
Certified. Verified. Proven on site. That’s why housebuilders choose Stormking for GRP.
Free nationwide delivery excludes the Highlands and Islands. Minimum spend applies, and specialist delivery vehicles are not included.
The best answer to whether GRP looks cheap is to see it installed.
The Grand Hotel, Birmingham. The Grade II listed hotel needed around 30 ornate dormers replaced, and traditional materials were too costly and too heavy for the restoration. We recreated the original Victorian designs in GRP, with drawings starting in January 2015 and the first dormers ready to install in early April.
Dawes Hill, Buckinghamshire. A national housebuilder wanted triangular brick chimneys, left- and right-handed dormers and bespoke entrance canopies across this development. We designed the components and made them at volume for every plot.
Loachbrook Meadow, Bovis Homes. We supplied SmartStack chimneys, tile effect WARMADORMA® dormers and door canopies to this award-winning development.
See more GRP projects in our case studies.
Send us your drawings or a description of what you need, and our technical and sales team will come back to you.
You can also call us on 01827 311 100 or email sales@stormking.co.uk.
Stormking’s Technical Hub contains drawing files and technical data for the Stormking range of products.
All Stormking products have been designed and engineered by our in-house team of technical experts, drawing from over three decades of experience in supplying the building sector.
Research by BRE (Information Paper IP 10/03) found that GRP can achieve service lives of 60 to 100 years. Separately, every product we make carries a 2-year guarantee from the date of purchase against faulty materials or workmanship. You can download the guarantee terms for details.
GRP doesn’t need regular painting or decorating, because the colour is in the gel coat. To keep the finish looking its best, clean it periodically with an ammonia-free detergent and avoid abrasive cleaners, wire wool or scourers, which can scratch the surface. If a component is knocked on site, we supply repair kits for small areas of damage for a small charge.
Your local planning authority decides each application on its own merits, and conservation areas and listed buildings usually face closer scrutiny of materials. GRP can meet that scrutiny. We replaced the dormers on the Grade II listed Grand Hotel in Birmingham, recreated from the original Victorian designs.
Most of our components are made to size and arrive fully assembled, ready to fix. COPEKING® is the exception, because short sections are cut to the length you need and fixed with the extra cleats we supply loose.
GRP cannot go into a standard plastics recycling stream, but specialist recycling and recovery routes do exist for it. Because our components are made off-site and arrive finished, very little GRP waste is created on your site in the first place.